Data Centre Magazine July, Issue 48 | Page 67

impact. That includes thermal load evaluation, temporary cooling where required, commissioning and carefully managed changeover planning. Even with careful planning and design, robust testing is necessary to ensure any issues with new and existing systems integration are worked out before going live. The modular approach provides a contained environment, facilitating these critical components in one package that can be built, tested and commissioned off-site and delivered ready for changeover.

“For today’ s large-scale data centre operators, traditional postbuild maintenance is no longer enough”

Becky Wacker VP of Data Center Solutions Trane datacentremagazine. com 67