AVK IN NUMBERS

8 UK and European offices

3,500MW Power across UK and Europe

20,000 + Projects and services delivered

300 + Global team members

Q. HOW SHOULD OPERATORS PREPARE THEIR CRITICAL POWER SYSTEMS TO MANAGE THE VOLATILITY OF BOTH AI WORKLOADS AND RENEWABLE-HEAVY GRIDS?

ยป Operators need to implement flexible microgrids capable of providing dispatchable power. AI workloads cause significant fluctuations, resulting in sudden peaks that conventional grid infrastructure struggles to manage. Using a hybrid system that integrates renewables, medium-speed engines