30MW

Critical IT load 10MW vaults consuming less than 13,000 square feet of space each​

120MW

Design capacity at dedicated on-site substation

80kW Average rack density

100 + kW

Rack high-density compute capacity at scale , less than 1 / 2 the per megawatt capital cost of comparable cold plate HPC [ high-performance computing ] expansions